Written by Stellar Roofing Company, a licensed Michigan roofer in Kentwood (Residential Builder license #262000779). Published September 24, 2026.
A roofing estimate is two documents pretending to be one. On the surface it's a price. Underneath, it's a scope of work: a written promise of exactly which materials go on your building, how much of each, and which details get replaced versus reused. The price only means something once you understand the scope, and two estimates with the same bottom line can describe very different roofs.
This guide walks through a typical residential replacement estimate line by line, the way a roofer or an insurance adjuster reads it. Then it covers how to put three bids side by side, what the tier upgrades actually buy, the red flags worth walking away over, how insurance estimates are structured, and what a commercial low-slope bid should contain. Nothing here assumes you'll hire any particular company. It's meant to make you a sharper reader of whichever estimates land on your kitchen table.
One caution before you start: roofing terms vary by region and by company. If a word on your estimate isn't explained here, our roofing glossary probably covers it, and any contractor worth hiring will happily explain their own line items.
The Four Kinds of Estimates You'll See
Before reading any line, figure out what kind of document you're holding. The format tells you how much the contractor has committed to in writing, and how much room is left for surprises.
1. The lump-sum proposal
One price, sometimes with a short paragraph: "Tear off and replace roof with architectural shingles, $X." It's the most common format for small contractors and the hardest to compare. A lump sum is not automatically bad, and plenty of honest roofers write them, but a lump sum with no written scope means the scope is whatever the contractor decides it is on install day. If you get one, ask for the material list and the scope in writing before you compare it with anything.
2. The itemized scope with one price
The most useful format for homeowners. Every component is listed (underlayment brand, ice barrier coverage, flashing, ventilation, and so on), usually with quantities, but the price is a single total. You can't see what each line costs, but you can see exactly what's included, which is what you need to compare bids.
3. The unit-price or line-priced estimate
Every line has a quantity, a unit, and a price. Common in commercial work and in estimates generated by roofing software. It gives you the most information, and it also makes the contractor's markup on each item visible, which is why many residential roofers avoid it. If you're comparing a line-priced estimate against a lump sum, compare scope first and price second.
4. The insurance-style estimate
If a storm claim is involved, you'll also see an estimate from your insurance company, almost always generated in estimating software such as Xactimate. It's line-priced and very detailed, uses its own abbreviations, and separates replacement cost from depreciation. It's a claim valuation, not a contractor's bid, and it's covered in its own section below.
Squares, Pitch, and the Waste Factor
Almost every residential estimate starts with the same three numbers. Get comfortable with them and half the estimate stops being mysterious.
Squares
Roofers sell and buy roofing by the square: 100 square feet of roof surface. A 2,400-square-foot roof is 24 squares. That's roof surface, not house footprint and not living area. A 1,500-square-foot ranch can easily have 20 or more squares of roof once you count the overhangs and the pitch.
Squares are also how prices convert. A price of $550 per square is the same as $5.50 per square foot. As a West Michigan 2026 ballpark, architectural asphalt replacements tend to land around $500 to $1,000-plus per square as a complete system (roughly $5 to $10-plus per square foot), and that range moves a lot with pitch, complexity, and deck condition. Treat any number like that as a sanity check, never a quote.
Measured vs. ordered squares
Good estimates show two numbers: the measured roof area, and the ordered quantity after waste. If a bid shows only one number, ask which it is. When one contractor says 28 squares and another says 32, they may be measuring the same roof, one before waste and one after. Or one of them may have measured wrong.
Most roofers now measure from aerial or satellite measurement reports, a drone, or by hand on the roof. Aerial reports are usually accurate to within a few percent on clear images but can miss things under heavy tree cover or on complex roofs. It's fair to ask how the roof was measured and to ask for a copy of the measurement report or diagram.
Pitch
Pitch (or slope) is written as rise over 12 inches of run: a 6/12 roof rises 6 inches for every foot. Pitch matters twice. It increases the actual surface area compared with the footprint, and it drives labor. Once roofs get to roughly 8/12 and steeper, crews need harnesses, roof jacks, and more time, so many estimates carry a steep-slope charge per square above a certain pitch, often with a higher tier for very steep roofs. That's a normal line item, not a padding tactic, as long as the pitch listed matches your roof.
Pitch also matters for code. The 2015 Michigan Residential Code does not allow asphalt shingles below 2/12, and between 2/12 and 4/12 it calls for a double layer of underlayment. If you have a low porch roof or a shallow addition, a good estimate treats it separately, often with a low-slope membrane instead of shingles.
The waste factor
Shingles get cut at every rake, hip, valley, and wall, and the offcuts can't always be reused. So ordered material is always more than measured area. The waste percentage is not set by any code, and manufacturers generally leave it to the installer, so what follows are industry rules of thumb rather than a standard.
The pattern is consistent, though: simple roofs waste less, cut-up roofs waste more. A waste factor far outside the range for your roof's shape deserves a question. Too low can mean the contractor will run short and either stop to reorder or start using up scraps. Too high, on a bid priced per square, just means you're paying for shingles that end up in the dumpster.
Typical waste allowances by roof shape (industry rules of thumb, not a code or manufacturer requirement)
| Roof Shape | Typical Waste | Why |
|---|---|---|
| Simple gable, few penetrations | About 10% | Long straight courses; rake cuts are the main waste |
| Hip roof | About 12% to 15% | Every course is cut at an angle where it meets a hip |
| Cut-up roof: dormers, several valleys | About 15% to 20% | Short courses, many valley and wall cuts |
| Very complex or steep with turrets | Can exceed 20% | Curves, short runs, and lots of hand-fitting |
Tear-Off, Layers, Disposal, and the Deck
Tear-off and number of layers
The tear-off line removes the existing roofing down to the deck. It's usually priced per square, per layer. Two layers take roughly twice the labor and produce twice the debris, so a good estimate states how many layers the contractor found. If the estimate is silent on layers and the price looks low, ask. A crew that discovers a second layer on install day may present it as a change order.
The 2015 Michigan Residential Code, Section R908.3.1.1, caps a roof at two layers. If you already have two, a full tear-off isn't optional. If you have one and a bid offers to "lay over" instead, understand what you're giving up: nobody gets to inspect or repair the deck, old flashing tends to stay in place, and many manufacturers limit or deny enhanced warranties on recovers. The code also forbids recovering over a roof that is water-soaked or deteriorated.
Disposal and dumpster
Disposal covers the dumpster or dump trailer, hauling, and landfill fees. It may be a separate line, bundled into tear-off, or priced per load. Asphalt shingles are heavy: one layer of architectural shingles runs into several tons on an average house, so disposal is a real cost. What you want to see in writing is where the container will sit (driveway damage is a common complaint), whether plywood or boards are placed under it, and that the price covers all layers found.
Deck and sheathing replacement
The deck is the plywood, OSB, or plank boards under the shingles. Nobody can see its full condition until the old roof is off. That's why most honest estimates price deck replacement one of two ways: an allowance (a set number of sheets included in the price, for example "includes up to 3 sheets of 7/16-inch OSB"), or a unit price ("rotted decking replaced at $X per 4x8 sheet as needed"). Both are normal, and both are better than silence.
How to judge the deck line: first, is there one at all? A bid with no mention of the deck either assumes it's perfect (optimistic) or plans to shingle over soft wood (bad). Second, is the per-sheet price stated? A unit price you can compare between bids protects you from an open-ended surprise. Third, what's the replacement material and thickness? It should match or beat the existing deck, and the fastening should meet code. Fourth, how will you know how many sheets were replaced? Ask for photos of the damaged sections before they're covered, or a count on the final invoice. A contractor who documents deck replacement with photos is a contractor who isn't padding it.
Plank decks (common on older West Michigan homes) deserve a specific question. Wide gaps between boards can be a problem for modern shingles, and some roofers recommend sheathing over planks with plywood or OSB. That's a legitimate line item on older homes, but it should be explained and priced up front, not discovered.
Drip Edge, Ice Barrier, Underlayment, and Starter
These are the layers and edges nobody sees once the roof is done, which is exactly why they're where low bids cut. They're also mostly governed by code and by the shingle manufacturer's installation instructions. Michigan's residential code (Section R905.1) requires roof coverings to be installed per the code and the manufacturer's instructions, so skipping a manufacturer requirement isn't just a warranty issue.
Drip edge
Drip edge is the L-shaped metal at the eaves and rakes that kicks water off the edge and protects the deck edge and fascia. The 2015 Michigan Residential Code, Section R905.2.8.5, requires drip edge at eaves and rake edges of shingle roofs, with adjacent pieces overlapped at least 2 inches. So a shingle bid without drip edge isn't a cheaper option. It's a code shortfall. The estimate should say new drip edge, list the lineal feet (eaves plus rakes), and ideally the color and profile.
Ice barrier (ice and water shield)
An ice barrier is a self-adhering rubberized membrane at the eaves that seals around nails and stops water backed up behind ice dams from getting into the house. Section R905.1.2 of the 2015 Michigan Residential Code requires it in areas with a history of ice forming at the eaves, as designated by the local jurisdiction, and it must run from the eave edge to at least 24 inches inside the exterior wall line. In West Michigan's climate, expect it to be required; your local building department can confirm.
Read this line carefully, because "ice and water shield" alone says little. How far up the roof does it run? One 3-foot-wide roll at the eave may not reach 24 inches inside the wall on a house with deep overhangs, so some roofs need two courses. Is it also in the valleys, around chimneys and skylights, and at sidewalls? Code only sets the eave minimum; the valleys and penetrations are manufacturer or best practice. Brand names vary. Many roofers still say "Grace" generically; that product line is now sold as CertainTeed VYCOR.
Underlayment: felt vs. synthetic
Underlayment covers the rest of the deck beneath the shingles. The old standard is asphalt-saturated felt ("15-pound" or "30-pound" felt). Most estimates today specify a synthetic underlayment: lighter, stronger, more tear-resistant, and more forgiving if it's exposed to weather for a day or two during the job. Both can be code-compliant. What matters is that the product is approved by the shingle manufacturer, and for enhanced warranties, usually that it's the manufacturer's own branded product.
On an estimate, look for the brand or at least the type (synthetic vs. felt), and whether it covers the entire deck outside the ice barrier. On slopes from 2/12 up to 4/12, Michigan's code calls for a double layer of underlayment, so a low-slope section should be called out separately.
Starter strip
Starter shingles go at the eaves and often the rakes, under the first course, so the first row has a sealant strip and no exposed gaps. Manufacturer-branded starter is typically required for enhanced warranties. Some crews cut starter from field shingles, which can work if done to the manufacturer's instructions, but it's worth asking which approach the bid assumes, since it can affect warranty eligibility.
Shingles, Hip and Ridge
The shingle line
The shingle line should name the manufacturer, the product line, and ideally the color. "Architectural shingles" alone isn't enough to compare bids, because product lines within the same brand differ in weight, wind rating, impact rating, and warranty. If one bid names a specific product and another says "30-year dimensional or equal," you're not comparing the same roof.
Three ratings are worth knowing. Wind: shingles are tested to wind standards, and many architectural lines carry a stated wind rating that may depend on using the manufacturer's starter and ridge and a specific nailing pattern. Impact: UL 2218 Class 4 is the highest impact rating and some insurers offer premium credits for it; check with your insurer before paying extra. Fire: asphalt shingles are typically Class A for fire. "30-year," "50-year," and "lifetime" are warranty labels, not how long the roof will last.
Nailing belongs here too. Code sets a minimum fastener count per shingle, but manufacturers often require more (commonly six) for high-wind warranty coverage. If a bid specifies the nailing pattern, that's a good sign.
Hip and ridge cap
Hip and ridge shingles cover the peaks. Modern estimates usually specify manufacturer-made ridge cap (thicker, pre-bent, often required for enhanced warranties) rather than three-tab shingles cut into pieces. The quantity is lineal feet of hips plus ridges. If there's a ridge vent, the cap goes over it, so the ridge vent and ridge cap lines should be roughly consistent with each other.
Ventilation: Intake, Exhaust, and Net Free Area
Attic ventilation is the line most often missing from a low bid and one of the most important for a Michigan roof. A poorly vented attic runs warm in winter, which melts snow that refreezes at the cold eave as an ice dam, and it cooks shingles from below in summer. Ventilation also affects most manufacturers' warranties.
How it's measured
Vents are rated by net free area (NFA): the actual open area air can move through, usually in square inches per vent or per lineal foot. The residential code's baseline (Section R806.2) is 1 square foot of net free ventilating area for every 150 square feet of vented attic floor, which can drop to 1 in 300 when certain conditions are met, such as a balanced split between high and low vents. Manufacturers publish their own requirements, typically calling for balanced intake and exhaust.
A good estimate names the exhaust (ridge vent, box vents, powered fans), the intake (soffit vents, continuous soffit, or edge intake vents at the eave), and the quantity. The best ones show the math: attic square footage, required NFA, and what the proposed vents provide.
Common problems a good bid addresses
Exhaust without intake is the classic mistake: a ridge vent installed on a house with painted-over or blocked soffits can't pull air, and it may pull conditioned air from the house instead. Mixing exhaust types on one attic (a ridge vent plus box vents, or plus a powered fan) can short-circuit airflow, and many manufacturers discourage it. If a bid removes old box vents and adds a ridge vent, it should also say what it's doing about intake. And bath and kitchen fans should vent outdoors through a proper roof or wall cap, not into the attic.
Flashing and Valleys
Most roof leaks start at flashing, not in the middle of the shingles. That makes the flashing lines the single most important thing to compare, and the easiest thing for a low bid to shortchange with the word "reuse."
Step flashing and counterflashing
Where a roof meets a wall (a dormer, a second story, a garage wall), individual L-shaped pieces of step flashing are woven in with each course of shingles. Counterflashing covers the top of the step flashing, either tucked under siding or cut into masonry. Michigan's residential code requires flashing at wall and roof intersections and wherever the slope or direction changes.
Replace vs. reuse is the question to ask. Step flashing is often behind siding, and replacing it properly may mean removing and reinstalling some siding, which costs more. Some bids reuse it to avoid that. Section R908.5 of the code prohibits reinstalling existing flashings and metal edgings that are rusted, damaged, or deteriorated, so reuse is only acceptable on metal that's genuinely sound, and you should be told which it is.
Kick-out flashing
Where a roof edge dies into a wall, a kick-out (diverter) flashing turns water away from the wall and into the gutter. The code requires a flashing that diverts water at that spot. A missing kick-out is a common cause of hidden wall rot, so look for it by name.
Chimney flashing and crickets
Chimneys get step flashing on the sides, apron flashing on the low side, and counterflashing set into the mortar joints above. On the high side, a chimney more than 30 inches wide (measured across the slope) requires a cricket or saddle under the code, a small peaked structure that sheds water around the chimney. A good estimate states whether chimney flashing is new, whether the counterflashing is cut into the mortar (reglet) or just surface-sealed, and whether a cricket is included where required. Caulk-only chimney "flashing" is a repair, not a flashing detail.
Pipe boots and other penetrations
Plumbing vents get a flashed boot, usually a metal or plastic base with a rubber collar. The rubber collars crack with UV exposure long before the shingles wear out, which is why most replacement bids include new boots. Some estimates offer upgraded boots with longer-lasting collars or lead flashings. Exhaust fan caps, furnace and water heater flues, satellite mounts, and electrical masts are also penetrations; the estimate should say how each is handled.
Valleys: open, closed, and woven
A valley is where two roof planes meet in an inside corner, and it carries more water than any other part of the roof. Valleys are lined first (code requires a lining per the manufacturer's instructions, and self-adhering ice barrier is common), then finished one of three ways. An open valley leaves a strip of metal exposed down the center; code requires metal valley lining at least 24 inches wide. A closed-cut valley runs shingles from one side across the valley and cuts the other side back in a clean line. A woven valley interlaces shingles from both sides; it's common with three-tab shingles and generally not recommended for thick architectural shingles.
None is wrong if it's installed to the manufacturer's instructions. The estimate should say which method will be used, what's under it, and whether metal is included.
Skylights, Gutters, Permit, Cleanup, and Warranty
Skylights
Skylights are one of the most misunderstood lines. The options are: reflash the existing skylight with a new flashing kit, replace the skylight unit, or remove it and deck over the hole. An older unit with failed seals or fogged glass is usually worth replacing while the roof is open, because replacing it later means disturbing the new roofing. If your estimate doesn't mention the skylights at all, ask. It should say which option, the make and size, and whether the interior finish (drywall, trim) is included or excluded.
Gutters
Some roofers install gutters and some don't, and an estimate may include gutter removal and reinstallation, new gutters, or nothing at all. What you want to know is who is responsible for the gutters during the job. Drip edge and ice barrier go under or behind the gutter line, so gutters sometimes have to come down. If the roofer isn't a gutter installer, confirm whether they'll detach and reattach existing gutters, and whether damage to old, brittle gutters is on you or them. If you're getting new gutters from a separate company, time it so the new gutters go up after the roof.
Permit
A reroof generally requires a building permit in Michigan communities, and the permit means an inspector checks the work. Some estimates list the permit as a line; others include it. What matters is that the contractor pulls it in their name, under their license. A contractor who asks you to pull the permit as the homeowner is shifting code responsibility to you. You can check a Michigan contractor's license through LARA's online license lookup.
Cleanup and magnetic sweep
Tear-off throws thousands of nails into flower beds and lawns. A cleanup line should include tarping landscaping, daily debris removal, and a magnetic nail sweep of the yard and driveway when the job's done. If it isn't written down, it isn't promised.
Warranty registration
There are two warranties on a roof. The manufacturer warranty covers the materials, and enhanced or system warranties often extend coverage to workmanship, but only if the contractor holds the right certification and the roof is installed with the required components and registered. The workmanship warranty is the contractor's own promise about their labor. A good estimate names both, states the length of each, and states who registers the manufacturer warranty and when. Ask for the registration confirmation after the job. Our warranty page explains how the two types differ.
Overhead, Profit, and Michigan Sales Tax
Overhead and profit (O&P)
Every contractor's price includes overhead (insurance, vehicles, office, licensing, warranty reserves) and profit. On most residential bids it's built into the unit prices, not shown. It shows up as a separate line mainly on insurance estimates, where adjusters commonly add a percentage for a general contractor's overhead and profit, often described in the trade as "10 and 10." Whether O&P is owed on a claim depends on the policy, the carrier, and whether the job needs a general contractor to coordinate several trades, so treat it as a claim question, not something to haggle over on a cash bid.
Michigan sales tax
This one confuses people. Under Michigan's sales and use tax rules, a contractor who installs materials that become part of your house is treated as the consumer of those materials. The contractor pays the 6 percent tax when buying the materials (or pays use tax on them) and builds that cost into the price. So a typical Michigan roof replacement estimate won't show a sales tax line, and that's normal, not a sign of anything wrong.
Michigan Treasury guidance does allow a contractor who consistently operates as a retailer to collect sales tax on the materials instead, as long as the tax remitted isn't less than tax on the materials' cost. If an estimate adds sales tax on top, it's fair to ask how it's calculated and that it isn't also baked into the unit prices. This is general information, not tax advice.
Deposit and payment schedule
Not a line item, but part of the estimate. Many roofers ask for a deposit when the contract is signed, often tied to ordering materials, with the balance due at completion. A payment schedule should be written, tied to milestones, and leave the largest share due after the work is done and inspected. For how Michigan's lien rules protect you (sworn statements and lien waivers under the Construction Lien Act), see our guide to hiring a roofer in Michigan.
A Sample Estimate, Annotated
Here's what a well-itemized residential replacement estimate might look like for a hypothetical hip roof with two valleys, one chimney, one skylight, and a single existing layer. The quantities are illustrative only, not from a real job, and prices are deliberately left off: what matters is that each line exists, is specific, and can be checked. The right-hand column is what to look for on your own estimate.
Illustrative example only. Quantities are invented for a hypothetical 26-square hip roof and are not a quote. Your roof's lines and quantities will differ.
| Line | Description | Qty | Unit | What to check |
|---|---|---|---|---|
| 1 | Measured roof area, 6/12 pitch, hip roof with 2 valleys | 26.4 | SQ | Is this measured or ordered? Ask for the diagram |
| 2 | Tear-off, 1 layer asphalt, to deck | 26.4 | SQ | Layer count stated; extra layer priced if found |
| 3 | Disposal, dumpster and landfill fees | 1 | EA | Placement, driveway protection, covers all layers |
| 4 | Deck repair allowance, 7/16" OSB, up to 3 sheets included | 3 | SHT | Unit price for additional sheets, photos of damage |
| 5 | Drip edge, eaves and rakes, new | 210 | LF | Required at eaves and rakes by MRC R905.2.8.5 |
| 6 | Ice barrier at eaves to 24" inside wall, plus valleys | 5.1 | SQ | Coverage distance, valleys and penetrations included |
| 7 | Synthetic underlayment, manufacturer-approved | 22 | SQ | Brand named; covers deck outside the ice barrier |
| 8 | Starter strip, eaves and rakes | 210 | LF | Manufacturer product if an enhanced warranty is promised |
| 9 | Architectural shingles, named product line and color | 30.4 | SQ | Ordered with about 15% waste for a hip roof |
| 10 | Hip and ridge cap, manufacturer | 96 | LF | Matches hips plus ridge length |
| 11 | Ridge vent over cut-open ridge | 34 | LF | NFA math shown; intake addressed |
| 12 | Intake: clear or add soffit vents | 12 | EA | Exhaust without intake doesn't work |
| 13 | Step flashing at sidewalls, new | 28 | LF | New, not reused; siding removal included? |
| 14 | Kick-out flashing | 2 | EA | One wherever a roof edge meets a wall |
| 15 | Chimney: new step, apron, counterflashing cut into mortar | 1 | EA | Cricket if wider than 30" across the slope |
| 16 | Pipe boots, new | 3 | EA | Type of collar; flues and fan caps listed |
| 17 | Valleys, closed-cut over ice barrier | 38 | LF | Method named; metal if open valley |
| 18 | Skylight: replace unit with new flashing kit | 1 | EA | Make and size; interior finish included or not |
| 19 | Steep-slope charge | 0 | SQ | Not applicable at 6/12; should appear on 8/12 and up |
| 20 | Building permit, pulled by contractor | 1 | EA | Contractor's name and license on the permit |
| 21 | Cleanup, tarping, magnetic nail sweep | 1 | EA | Daily and final cleanup in writing |
| 22 | Manufacturer warranty registration + workmanship warranty | 1 | EA | Names, lengths, who registers and when |
Notice a few things. Line 9 orders about 15 percent more shingle than line 1 measures, consistent with a hip roof. Line 4 states an included quantity and implies a price for more. Line 6 describes coverage, not just a product. Line 19 shows a zero instead of silence, which tells you the contractor considered it. An estimate doesn't need to look exactly like this, but every one of these questions should have an answer somewhere in writing.
Allowances, Change Orders, and Exclusions
Allowances
An allowance is a placeholder amount for something that can't be priced exactly until the work starts, most often deck replacement. Allowances are normal and honest when they're specific: a quantity, a unit price, and what happens if the actual is higher or lower. Look for language like "includes 3 sheets; additional sheets at $X each; unused allowance credited." The credit part matters. If the allowance is 3 sheets and only 1 was needed, you should see a credit or at least an explanation.
A vague allowance ("deck repair as needed, billed at time and materials") isn't necessarily dishonest, but it leaves you with no way to compare bids or check the bill. Ask for a unit price.
Change orders
A change order is a written, signed change to the contract: added work, removed work, or a substitution. Legitimate change orders happen, most often for hidden rot, a second layer nobody could see, or a homeowner request mid-job. The protection is in the process. Every change should be written, priced, and signed before the work is done, ideally with photos of why. A contractor who says "we'll figure it out at the end" is setting up a disagreement.
Watch for estimates whose low price depends on predictable change orders: no deck line, no mention of layers, flashing marked "as needed." Those bids aren't cheaper; they're incomplete.
Exclusions
Read the exclusions section as carefully as the inclusions. Common exclusions: interior drywall and paint damage, gutters, siding replacement, structural framing repairs, removal of satellite dishes, and damage to driveways from delivery trucks. None of these is unreasonable to exclude, but you should know before signing, not after.
Comparing Three Bids Apples to Apples
Getting three estimates is standard advice, but three estimates are only useful if you can line them up. The trick is to compare scope before price. Print the worksheet below (or copy it into a spreadsheet), fill in each bid's answer for every row, and leave blanks where a bid is silent. Blanks are your question list.
Once the scope rows are filled in, you'll usually find the bids aren't priced differently so much as scoped differently. One includes intake vents and new step flashing; one doesn't mention either. At that point you can ask the lower bidders to price the missing items, and compare again. Most of the time the gap narrows sharply.
Price per square is a quick normalizer: divide each total by the ordered squares. If one bid is dramatically lower per square than the other two with the same scope, that's worth a direct question, not an automatic yes. And if the lowest bid is also the vaguest, the price is probably low because the scope is.
| Scope Item | Bid A | Bid B | Bid C | Notes |
|---|---|---|---|---|
| Measured squares / ordered squares | Large gaps mean someone mismeasured | |||
| Layers to remove | Is a second layer priced? | |||
| Deck: allowance and per-sheet price | Unit price comparable? | |||
| Drip edge (eaves and rakes) | New? Lineal feet? | |||
| Ice barrier coverage | Eave distance, valleys, penetrations | |||
| Underlayment brand and type | Synthetic or felt; approved by manufacturer? | |||
| Shingle manufacturer and line | "Or equal" is not a product | |||
| Starter and ridge cap | Manufacturer or cut from field shingles? | |||
| Ventilation: exhaust + intake | NFA math? Intake addressed? | |||
| Step and wall flashing | New or reused? | |||
| Kick-outs, chimney, cricket | Counterflashing cut in? | |||
| Pipe boots and other penetrations | All listed? | |||
| Valley method | Open, closed-cut, or woven | |||
| Skylights | Reflash, replace, or remove | |||
| Gutters | Who detaches and reattaches? | |||
| Permit | Pulled by contractor? | |||
| Cleanup and magnet sweep | In writing? | |||
| Manufacturer warranty tier | Registered by whom? | |||
| Workmanship warranty (years) | In writing, transferable? | |||
| Payment schedule | Deposit size, balance at completion | |||
| Total price | Compare last, not first |
What Good, Better, Best Really Changes
Many roofers present three tiers. That's a reasonable way to sell, and it's also a way to make the middle option look sensible. Read what actually changes between tiers, line by line. The table below shows a common pattern; every company packages it differently.
Two things should never change between tiers: code items and flashing quality. Drip edge, code-required ice barrier, ventilation that meets code, and new flashing where it's deteriorated belong in the cheapest option. If the good tier skips them, it isn't a lower tier; it's a non-compliant roof. What legitimately changes is the shingle line, the brand-matched accessories, extended coverage beyond code minimums, and the warranty tier.
Is the best tier worth it? It depends on how long you'll own the building, whether you want an impact-rated shingle for insurance reasons (ask your insurer what credit, if any, they offer), and how much the warranty upgrade actually adds. Read the warranty document itself, not the brochure, and note what's prorated and when.
| Component | Typical "Good" | Typical "Better" | Typical "Best" |
|---|---|---|---|
| Shingle line | Entry architectural line | Upgraded line: heavier or better wind rating | Premium or impact-rated (Class 4) line |
| Underlayment | Basic synthetic or felt | Manufacturer synthetic | Premium manufacturer synthetic |
| Ice barrier | Code minimum at eaves | Eaves plus valleys and penetrations | Extended eave coverage plus all details |
| Accessories | Generic starter and ridge | Manufacturer starter and ridge | Full manufacturer system |
| Ventilation | Replace existing vents like-for-like | Ridge vent plus intake review | Balanced design with NFA calculation |
| Manufacturer warranty | Standard limited warranty | Enhanced system warranty | Top-tier warranty with workmanship coverage |
Red Flags on a Roofing Estimate
A lump sum with no written scope
If the estimate is one number and a sentence, you have no way to know what you're buying or to hold anyone to it.
"Or equal" materials
"Architectural shingles or equal" lets the contractor substitute whatever is cheapest that week. Ask for a named product. If a substitution becomes necessary, it should be a written change you approve.
No deck line at all
Either the bid assumes a perfect deck or it plans to cover damaged wood. Either way, you'll learn the answer at the worst possible time.
Reused flashing without explanation
Reuse is only acceptable for metal that is genuinely sound, and the code bars reinstalling rusted or damaged flashing. "Reuse existing" on every flashing line deserves a hard question.
No permit, or asking you to pull it
Skipping the permit skips the inspection. Asking the homeowner to pull a permit shifts responsibility to you.
A large deposit up front
A deposit tied to materials is normal. Paying most of the job before work starts leaves you with little leverage if things go wrong. Be especially careful with contractors who arrive after a storm.
Pressure to sign today
"This price is only good if you sign now" is a sales tactic. A legitimate estimate is good for a stated period, typically weeks.
Offers to cover your deductible
No Michigan statute specifically bans a contractor from waiving a deductible, but inflating a claim to cover it is insurance fraud under Michigan law (MCL 500.4503), and it can expose the homeowner too. This is general information, not legal advice.
No license number or proof of insurance
Michigan residential builders must be licensed. Ask for the license number, verify it with LARA, and ask for a current certificate of liability and workers' compensation insurance.
Warranty promises that aren't in writing
"Lifetime warranty" said aloud is worth nothing. Get the manufacturer tier and workmanship years written into the contract.
Questions to Ask Before You Sign
Any contractor should be able to answer these without hesitation. The answers belong in the written estimate or contract, not just in conversation.
- 1.How did you measure the roof, and can I see the report or diagram?
- 2.How many layers are on the roof now, and what happens to the price if you find another?
- 3.What is your per-sheet price for deck replacement, how many sheets are included, and how will I know how many you replaced?
- 4.Exactly which shingle, underlayment, starter, and ridge cap products are you installing?
- 5.How far up the roof does the ice barrier run, and is it in the valleys and around penetrations?
- 6.What ventilation are you installing, and how did you size the intake and exhaust?
- 7.Which flashings are new and which are reused? What about the chimney, and is a cricket needed?
- 8.What valley method will you use?
- 9.Who pulls the permit, and in whose name?
- 10.Which manufacturer warranty will this qualify for, who registers it, and how long is your workmanship warranty?
- 11.What's excluded from this price?
- 12.What's the payment schedule, and when is the balance due?
- 13.Who will be on site, is the crew yours or subcontracted, and who is my contact during the job?
- 14.How do you handle change orders?
For a shorter version to print, see 12 questions to ask a roofer.
Reading an Insurance Estimate
What an insurance estimate is
When you file a roof claim, your insurance company's adjuster writes an estimate of the covered loss, usually in Xactimate, estimating software from Verisk used widely across the property insurance industry. Its line items come from a regional price list that the software maker updates regularly, so a claim in Grand Rapids is priced against local labor and material costs. The estimate is the carrier's valuation of your loss. It is not a contractor's bid, and it doesn't commit any contractor to build the roof for that number.
The format looks intimidating but follows a pattern: a line for each item with a code, a description, a quantity, a unit, and a unit price, grouped by area (each roof slope, or the roof overall, then gutters, siding, interior, and so on). You'll see units like SQ (square), LF (lineal foot), SF (square foot), and EA (each). The same components covered earlier in this guide appear here: tear-off, felt or synthetic underlayment, ice barrier, drip edge, starter, shingles, ridge cap, vents, flashing, and often a steep-slope or high-roof charge.
RCV, ACV, and depreciation
Replacement cost value (RCV) is what it would cost to replace the damaged items with new ones today. Actual cash value (ACV) is RCV minus depreciation, the carrier's estimate of wear the old roof had before the loss. On a replacement cost policy, carriers commonly pay ACV first and release the withheld depreciation (recoverable depreciation) after the work is completed and documented. On an ACV-only policy, the depreciation generally isn't paid back. Your declarations page and policy language decide which you have. Some policies also settle roofs on a schedule based on age.
What this means for reading the estimate: the summary page shows RCV, depreciation, ACV, your deductible, and the net check amount. Your first check will usually be smaller than the contractor's price even if the claim is fully covered. That's the depreciation holdback, not necessarily a shortfall.
O&P and code upgrade lines
Insurance estimates may include general contractor overhead and profit, often as percentages on the summary page. Whether the carrier includes O&P depends on the policy, the carrier's guidelines, and whether the job reasonably requires a general contractor to coordinate multiple trades.
Code upgrade items are the ones building codes require on a new roof that the old roof didn't have, for example drip edge where there was none, or ice barrier where the old roof predated the requirement. Whether those are paid depends on whether your policy includes ordinance or law coverage and its limits. Look for those lines by name, and check your declarations page for the coverage.
How a contractor's estimate differs from the adjuster's
The adjuster writes what they observed and what the software prompted, often after a short inspection. A roofer writes what it takes to build the roof to code and to the manufacturer's instructions. The two often differ on quantities (measured squares, waste, ridge length), on items the adjuster didn't list (starter, ice barrier in valleys, pipe boots, step flashing, steep charges, a second layer), and on labor factors like pitch and access.
Differences are resolved through documentation, not arguing. A contractor can provide photos, measurements, and a line-by-line scope showing what the adjuster's estimate is missing. The carrier may then issue a revised estimate, usually called a supplement. Supplements are a normal part of claims when legitimate items were missed. A supplement for items that weren't damaged or aren't needed is not.
Keep roles straight: a roofer can document the roof, write a scope, and meet the adjuster to point out what's there. Negotiating the claim itself belongs to you, or to a licensed public adjuster or attorney you hire. If you and the carrier can't agree on the amount of loss, Michigan's required fire policy provisions include an appraisal process (MCL 500.2833(1)(m)), where each side picks an appraiser and an umpire resolves differences. This is general information, not legal advice.
Matching the two documents
Ask your contractor to walk through their estimate against the adjuster's, line by line, and to flag every difference with a reason. Where the contractor's scope is larger, you should see photos or code references. Where it's smaller, ask why. The final contract should be for a defined scope and price, and you should understand how it lines up with what the carrier is paying.
| Term | What It Means | What to Check |
|---|---|---|
| RCV | Replacement cost value: cost to replace with new today | Matches your policy's settlement basis |
| Depreciation | Deduction for age and wear before the loss | Recoverable or non-recoverable? |
| ACV | RCV minus depreciation | Usually the first check on an RCV policy |
| Deductible | Your share, subtracted from the payment | Paid by you; can't be "absorbed" by inflating the claim |
| O&P | General contractor overhead and profit | Included or not, and why |
| Code upgrades | Items required by current code | Ordinance or law coverage and its limit |
| Supplement | Revised estimate after missed items are documented | Backed by photos and measurements |
General information, not legal or insurance advice. Your policy language controls. For more, see our insurance roof claims guide.
Reading a Commercial Low-Slope Bid
Commercial roofing bids for flat and low-slope buildings are written differently from residential ones. They're more technical, more likely to be line-priced, and more likely to include unit prices for unknowns. If you manage a building, own a business, or sit on an association board, these are the lines that determine whether two bids describe the same roof.
Existing conditions: core cuts and moisture surveys
A commercial low-slope bid should start with what's actually on the roof. Core cuts are small samples cut through the roof to the deck to identify each layer: membrane type, cover board, insulation type and thickness, and whether anything is wet. A thorough bidder takes several and patches them. Many projects also use a nondestructive moisture survey (infrared, capacitance, or nuclear) to map wet insulation. If a bid was written without cores or a survey, ask what it's based on.
Recover vs. tear-off
A recover installs a new membrane over the existing roof, often with a cover board. A tear-off removes the old system to the deck. Recovers can cost less and keep debris out of a landfill, but only when the existing roof is dry, sound, and not already layered. Building codes generally prohibit recovering over a wet or deteriorated roof or over a roof that already has two layers, so the core cuts and survey decide whether a recover is even possible. A bid that proposes a recover without that evidence is guessing.
Insulation, R-value, and tapered systems
The bid should state insulation type (polyiso is common), total thickness, and the resulting R-value. When a roof is replaced down to the deck, the energy code may require the new insulation to meet current levels, which can be significantly thicker than what came off. Your designer or local building department can tell you what applies. Tapered insulation creates slope to drains on a flat deck. It should come with a layout drawing showing slope (often 1/4 inch per foot or 1/8 inch per foot), crickets between drains, and the thickness at drains and high points, because that affects edge and flashing heights.
Membrane, thickness, and attachment
The membrane line should name the system (TPO, PVC, EPDM, modified bitumen, or a coating), the manufacturer, and the thickness in mils. TPO and PVC are commonly 45, 60, or 80 mil; EPDM 45, 60, or 90 mil. Thicker isn't automatically better for every building, but you need the same thickness across bids to compare them. Then the attachment method: mechanically fastened (plates and screws in the seams), fully adhered (glued), induction-welded, or ballasted. Attachment drives wind uplift performance and cost, and it should match the uplift design for your building and any insurer requirements.
Flashing heights, edges, and penetrations
Look for the base flashing height at walls and curbs (manufacturers set minimums, commonly 8 inches above the finished roof surface), how rooftop units and curbs will be handled (including whether units must be lifted), the edge metal and whether it's a tested system, drains and scuppers, and pitch pans or boots at pipes. If added insulation raises the roof, flashing heights, curbs, and door thresholds may need to be raised too; the bid should say so.
Warranty: NDL vs. material-only
Commercial warranties vary more than residential ones. A manufacturer's no dollar limit (NDL) warranty covers repair of covered leaks without a cap tied to the original price, usually requires a certified installer, and usually involves a manufacturer inspection at completion. Material-only and limited-dollar warranties cover less. The bid should state the warranty type, term (10, 15, 20 years or more), wind speed coverage if any, and the contractor's own workmanship term.
Submittals, lead time, alternates, and unit prices
Commercial bids usually reference submittals: product data, the manufacturer's warranty application, tapered layout drawings, and sometimes wind uplift calculations. Ask when they'll be delivered. Lead time for materials and the weather window matter, especially for adhered systems with temperature limits during Michigan's shoulder seasons.
Alternates are separately priced options (a thicker membrane, a longer warranty, added insulation). Unit prices are critical for wet insulation replacement: since no survey is perfect, the bid should state a price per square foot or per board to replace wet insulation found during tear-off, and deck repair prices per square foot. Those unit prices are how you compare the real exposure between bids.
Commercial bid comparison worksheet
| Bid Line | Bid A | Bid B | Bid C |
|---|---|---|---|
| Core cuts / moisture survey done | |||
| Recover or tear-off | |||
| Insulation type, thickness, R-value | |||
| Tapered layout drawing provided | |||
| Cover board | |||
| Membrane type, manufacturer, mils | |||
| Attachment method | |||
| Base flashing height at walls and curbs | |||
| Edge metal system | |||
| Drains, scuppers, penetrations | |||
| Rooftop units: disconnect, lift, reset | |||
| Warranty type (NDL or other) and term | |||
| Unit price: wet insulation replacement | |||
| Unit price: deck repair | |||
| Alternates priced | |||
| Submittals and schedule |
Before You Sign
An estimate becomes a contract when you sign it. Before you do, make sure the scope you've been comparing is the scope written on the signature page, not a shorter version. Check that the contractor's legal name, license number, and address are on the document; that the product names, warranty terms, payment schedule, and exclusions are all written; and that nothing important lives only in the salesperson's verbal promises.
If you sign at home after a salesperson's visit, federal and Michigan rules on home solicitation sales generally give you a short window to cancel. The FTC's Cooling-Off Rule covers sales of $25 or more made at your home and gives three business days to cancel, and Michigan's Home Solicitation Sales Act provides similar protections. The contract should include a cancellation notice. This is general information, not legal advice.
Finally, keep everything: every estimate, every change order, photos, the permit, lien waivers, and the warranty registration. The day you sell the house, a buyer's inspector and agent will want to know what's on the roof and whether the warranty transfers.
Want Another Set of Eyes on an Estimate?
If you're in West Michigan and holding an estimate you can't make sense of, we're happy to look at it with you, whether or not we end up bidding the job. Call or text (616) 840-1927 or schedule a roof inspection.
Related Roofing Resources
Roofing Glossary
Plain definitions for every term on an estimate.
Learn MoreHow to Hire a Roofer in Michigan
Licensing, insurance, contracts, and lien waivers.
Learn MoreRoof Replacement Cost
West Michigan ballpark ranges and what drives them.
Learn MoreInsurance Roof Claims
How roof claims, scopes, and coverage work.
Learn MoreRoofing Calculators
Estimate squares, pitch, and materials yourself.
Learn More12 Questions to Ask a Roofer
A short list to bring to every estimate.
Learn MoreCommon Roofing Scams in Michigan
Storm chasers, deductible schemes, and more.
Learn MoreCommercial Roof Cost
Per-square-foot ranges for low-slope systems.
Learn MoreRoofing Estimate Questions
What is a square in a roofing estimate?
A square is 100 square feet of roof surface. A roof with 2,400 square feet of surface is 24 squares. It measures roof area including pitch and overhangs, not the house's footprint or living space, so most roofs have more squares than people expect.
Why are my three roofing estimates so different?
Usually because they describe different scopes, not because one company is cheaper. Compare measured squares, layers, deck allowance, ice barrier coverage, ventilation, and new vs. reused flashing line by line. Once the scopes match, the prices usually move much closer together.
What waste factor is normal on a roofing estimate?
There's no code number. Common industry rules of thumb are around 10 percent for simple gable roofs, about 12 to 15 percent for hip roofs, and 15 to 20 percent for cut-up roofs with dormers and several valleys. Ask about waste that's far outside the range for your roof's shape.
Is a deck replacement allowance a normal line item?
Yes. Nobody can see the whole deck until the old roof is off, so honest estimates either include a set number of sheets or state a per-sheet price for any that need replacing. Ask for the unit price, how many sheets are included, and photos of damaged decking before it's covered.
Does Michigan code require drip edge and ice and water shield?
The 2015 Michigan Residential Code requires drip edge at eaves and rake edges of shingle roofs (Section R905.2.8.5) and an ice barrier from the eave to at least 24 inches inside the exterior wall where the local jurisdiction designates a history of ice damming (Section R905.1.2). In West Michigan, expect the ice barrier to be required; confirm with your building department.
Should a roofing estimate include sales tax in Michigan?
Usually not as a separate line. Michigan treats a contractor who installs materials into real property as the consumer of those materials, so the contractor pays the tax on materials and builds it into the price. A contractor that operates as a retailer can elect to collect sales tax instead. If you see a tax line, ask how it's calculated. This is general information, not tax advice.
Is it OK if an estimate reuses my old flashing?
Only if the flashing is genuinely sound. Michigan's residential code bars reinstalling existing flashings and metal edgings that are rusted, damaged, or deteriorated. Pipe boots and step flashing are commonly replaced on a full replacement. If a bid says reuse, ask which pieces and why.
What's the difference between RCV and ACV on an insurance estimate?
RCV (replacement cost value) is the cost to replace with new today. ACV (actual cash value) is RCV minus depreciation for the roof's age and wear. On a replacement cost policy, carriers commonly pay ACV first and release recoverable depreciation after the work is completed. Your policy determines which applies.
What is a supplement on a roof insurance claim?
A supplement is a revised insurance estimate issued after legitimate items missing from the original estimate are documented, such as starter, ice barrier, flashing, or a second layer found during tear-off. It's a normal part of many claims when backed by photos and measurements.
How much deposit should I pay a roofer?
There's no single right number. A modest deposit tied to ordering materials is common, with the balance due at completion. Be cautious of paying most of the job before work starts, and make sure the payment schedule is written into the contract.
What should a commercial flat roof bid include?
Existing conditions from core cuts or a moisture survey, whether it's a recover or tear-off, insulation type and R-value, a tapered layout if used, membrane type and thickness in mils, attachment method, flashing heights, the warranty type and term, and unit prices for wet insulation and deck replacement.
What This Page Cites
- 2015 Michigan Residential Code, Chapter 9 Roof Assemblies (R903.2.1 flashing locations, R903.2.2 crickets, R905.1 manufacturer instructions, R905.1.2 ice barriers, R905.2.8.2 valleys, R905.2.8.5 drip edge, R908 reroofing): https://up.codes/viewer/michigan/mi-residential-code-2015/chapter/9/roof-assemblies
- City of Grand Rapids, Roof Assemblies (Chapter 9 Michigan Residential Code) handout: https://www.grandrapidsmi.gov/media/hwjhl3xx/roof-assembly-requirements.pdf
- International Residential Code 2015, R905.1.2 Ice barriers: https://codes.iccsafe.org/s/IRC2015/chapter-9-roof-assemblies/IRC2015-Pt03-Ch09-SecR905.1.2
- International Residential Code 2015, R905.2.8.5 Drip edge: https://codes.iccsafe.org/s/IRC2015/chapter-9-roof-assemblies/IRC2015-Pt03-Ch09-SecR905.2.8.5
- Michigan Department of Treasury, Contractor Manual (sales and use tax for real property contractors): https://www.michigan.gov/documents/taxes/Contractor_Manual_638351_7.pdf
- Michigan Department of Treasury, Construction FAQ (sales and use tax): https://www.michigan.gov/taxes/business-taxes/sales-use-tax/information/construction-faq
- Michigan Insurance Code, MCL 500.2833 (required fire policy provisions, including appraisal): https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-500-2833
- Michigan Insurance Code, MCL 500.4503 (fraudulent insurance acts): https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-500-4503
- Federal Trade Commission, Cooling-Off Rule (16 CFR Part 429): https://www.ftc.gov/legal-library/browse/rules/cooling-period-sales-made-home-or-other-locations
- Michigan Home Solicitation Sales Act, MCL 445.111 et seq.: https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-445-111
- Michigan LARA, license verification: https://www.michigan.gov/lara